Greatest Time of All Control Contractor in Graphics Generation
To Achieve Effective Alias Graphics:
The Graphics Designer alone cannot simplify the process. Success relies on the following two teams understanding the core graphics ideology:
Software Team:
Programmers: For Alias Graphics to be effective, the database and DDC program must be created with accurate input and output point tags. Without this, the Alias Graphics method cannot be utilized effectively.
Design Team:
Even if the database and programming are correctly executed according to the control submittal, if the design team does not create a control submittal with a proper input and output schedule, the benefits of Alias Graphics will be lost.
If the Control Contractor or Mechanical Contractor aims to reduce time and improve graphics generation efficiency, it is crucial to focus on the design phase from the start.
A flawed initial design will lead to a "Building Automation Graphics Infinity Loop."
To avoid this loop and ensure successful deliverables, you need a team of "Avengers" who can address and resolve issues from the beginning.