11 Things Important in HVAC Control Submitta
This documentation package provides a complete overview of the key components needed for designing and implementing a building or process control system. The Network Riser diagram shows how communication devices are interconnected vertically across floors or zones, ensuring effective data flow. The BAS Control Panel outlines the centralized automation hardware that monitors and manages building systems such as HVAC and lighting.
1. Network Riser
2. BAS Control Panel
3. Equipment Flow Diagram
4. Sequence of Operation
5. IO Points Hardaware Schedule
6. Point To Point Wiring
7. Valve Schedule
8. Damper Schedule
9. Room Schedule
10. Bill of Material
11. Control Catalog